800+ criteria · 250+ layers · 200+ official sources · 0–100 score

Everything that decides viability, in a single engine.

Three geospatial questions decide a project: where to build, whether it can connect and whether the parcel is viable. CapiGIS answers them with status flags traceable to the source.

The pipeline

From coordinates to decision, in four steps.

01 · INPUT

Coordinates / KMZ / region

A parcel, a search area or an A→B route. No software to install.

02 · LAYERS

250+ official layers

Environmental, grid, cadastre, topography, social and physical risk. The country’s data, curated locally.

03 · SCORE

800+ criteria · cited vetoes

A reproducible 0–100 score and every deal-killer with its regulation. Where data is missing, grey.

04 · DELIVERY

Delivery · <24 h

Ready for the investment committee and for your own systems. And with Vigía, the verdict stays monitored.

What the analysis covers

Six blocks, worked in parallel from day one.

Environmental & permitting

Protected areas by legal category, wetlands and archaeology. Deal-killers in red, with the rule cited.

Grid connection · the difference

Not just distance. Capacity, queue and saturation, plus which reinforcement frees headroom and when.

Topography & usable area

Satellite slope and truly installable hectares. MWp and CAPEX adjust on their own.

Cadastre

Real parcel, ownership where the registry publishes it, ejidos and prior consultation.

Social & territory

Settlements, communities and heritage. Opposition risk is assessed at the start.

Preliminary economics

CAPEX, LCOE and NPV/IRR bands with cited benchmarks, ready for committee.

The same engine · your criteria

Not every buyer values a project the same way. Neither should the scoring.

Your criteria are captured as a scoring profile and applied identically to every site. The same land can be a GO for one buyer and a REVIEW for another, and both are right.

Greenfield developer

Aggressive pipeline: speed, queue and land cost. The Top-N opens the funnel.

profile: weight on grid+land · conditions acceptable as GO-COND

EPC / builder-operator

Constructability, access and real slope. No surprises on site.

profile: weight on terrain+access · conservative usable-area ratios

Utility / IPP

A 30-year asset: firm grid, clean permitting, low social risk.

profile: expanded vetoes · grid horizon with reinforcements

Fund / institutional

The economics band rules, and the early NO-GO is the committee’s best friend.

profile: economics in a band + permitting risk as ranking driver

The profile is documented in the report: which weights and thresholds were applied and why. Criteria tuned to the client, never a black box. Switching profiles is a cheap re-run over the same sites, so a “developer view” versus “fund view” comparison can be commissioned too.

See it working on your case.

Tell us the site or area and what you need decided. You get a closed proposal before any work starts.

Analyze your project